How to Apply Diversity Factors in Maximum Demand Calculations (AS/NZS 3000)
Diversity factors are the difference between a 400A switchboard and a 1000A switchboard. Learn how to correctly apply AS/NZS 3000 Appendix C diversity to industrial, commercial, and residential loads.
Maximum demand is the highest electrical load that an installation is expected to draw at any one time. It is NOT the sum of all connected loads — it is the sum adjusted for the probability that all loads will not operate simultaneously at full load.
This adjustment is called the diversity factor (or demand factor, depending on the standard — more on that distinction shortly). Getting diversity right is the difference between specifying a 400 A main switchboard and a 1000 A one. Overestimate the maximum demand, and you waste tens of thousands of dollars on oversized equipment, cables, and transformer capacity. Underestimate it, and you get nuisance tripping on the main breaker, overloaded cables, and an expensive upgrade within months of commissioning.
AS/NZS 3000:2018 (the Wiring Rules) provides diversity factors in Appendix C. These are informative (not normative), but they are the accepted basis for maximum demand calculations in Australia and New Zealand. Every supply authority references them, and every electrical designer is expected to know them.
Demand Factor vs Diversity Factor: Clear the Confusion First
These two terms are used inconsistently across different standards and textbooks. Here is the precise distinction:
Demand factor = maximum demand of a load / connected load of that load
A single motor rated at 15 kW that draws 12 kW maximum in operation has a demand factor of 0.80. This factor applies to individual loads or load categories.
Diversity factor = sum of individual maximum demands / maximum demand of the combined system
If five motors have individual maximum demands summing to 60 kW, but the combined system maximum demand is 45 kW (because not all motors run at full load simultaneously), the diversity factor is 60/45 = 1.33.
Diversity Factor Convention
In AS/NZS 3000 Appendix C, the term "diversity" is used to mean the multiplier applied to reduce the connected load to the expected maximum demand. A diversity of 0.6 means you take 60% of the connected load. This is technically a demand factor (less than 1.0), not a diversity factor (greater than 1.0) per the IEEE definition. Both conventions exist in practice. AS/NZS 3000 uses the "less than 1.0" convention.
AS/NZS 3000 Appendix C: The Structure
AS/NZS 3000:2018, Appendix C — Maximum demandAppendix C provides maximum demand values and diversity allowances for different categories of load. The key tables are:
| Table | Load Category | Application |
|---|---|---|
| C1 | General loads | Lighting, socket outlets, cooking appliances, water heating |
| C2 | Motor loads | Single motor, group of motors |
| C3 | Air conditioning | Heating and cooling loads |
| C4 | Specific equipment | Welders, X-ray, lifts |
The fundamental approach is:
- List all connected loads by category
- Apply the demand factor for each category per the relevant table
- Sum the diversified demands to get the total maximum demand
- Apply any further diversity factor for the supply type (residential, commercial, industrial)
Worked Example: Industrial Workshop
Consider an industrial workshop with the following connected loads:
Connected Load Schedule
| Load | Quantity | Rating Each | Total Connected |
|---|---|---|---|
| Lathe motors | 3 | 7.5 kW | 22.5 kW |
| Milling machine motors | 2 | 11 kW | 22.0 kW |
| CNC machine | 1 | 15 kW | 15.0 kW |
| Hydraulic press | 1 | 22 kW | 22.0 kW |
| Overhead crane | 1 | 15 kW | 15.0 kW |
| Fluorescent lighting | - | - | 8.0 kW |
| Socket outlets (general) | 20 | 230V/10A | 46.0 kVA |
| Air conditioning (3-phase) | 2 | 10 kW | 20.0 kW |
Total connected load: 170.5 kW/kVA
Without diversity, this workshop would need a 170 kW supply — approximately a 250 A main breaker at 415 V. Let us apply Appendix C diversity and see what the actual maximum demand is.
Step 1: Motor Loads
AS/NZS 3000:2018, Appendix C, Table C2 — Maximum demand for motor loadsAS/NZS 3000 Appendix C Table C2 provides the following method for a group of motors:
- Largest motor: 100% of full-load current
- Second largest motor: 100% of full-load current (if duty requires simultaneous operation)
- Remaining motors: apply a diversity factor based on the number of motors and the application
For an industrial workshop where motors are used intermittently (job shop, not continuous production line):
The largest motor is the hydraulic press at 22 kW. The CNC and crane are 15 kW each. The convention for intermittent-duty workshop motors:
- Largest motor: 100% = 22.0 kW
- Second largest: 80% = 15.0 x 0.80 = 12.0 kW
- Third largest: 60% = 15.0 x 0.60 = 9.0 kW
- Fourth largest: 60% = 11.0 x 0.60 = 6.6 kW
- Fifth largest: 60% = 11.0 x 0.60 = 6.6 kW
- Sixth: 50% = 7.5 x 0.50 = 3.75 kW
- Seventh: 50% = 7.5 x 0.50 = 3.75 kW
- Eighth: 50% = 7.5 x 0.50 = 3.75 kW
Diversified motor load = 67.5 kW (from 96.5 kW connected = 70% overall demand factor)
Continuous vs Intermittent Duty Matters
The diversity factors above assume intermittent motor operation (typical workshop). For a continuous production line where all motors run simultaneously, the diversity factor for all motors after the largest is 100% — no diversity is applied. Misidentifying a continuous process as intermittent duty is one of the most common errors in maximum demand calculations.
Step 2: Lighting Load
AS/NZS 3000:2018, Appendix C, Table C1 — Maximum demand for general loadsFor an industrial workshop, lighting is typically all on during working hours. Apply 100% demand factor for the total lighting load:
Diversified lighting load = 8.0 kW
AS/NZS 3000 allows diversity on lighting only when there are multiple independently controlled circuits and a realistic probability that not all will be on simultaneously (e.g., a multi-storey office building with separate zone lighting). A single workshop — all lights on or all off — gets no diversity.
Step 3: Socket Outlets
AS/NZS 3000:2018, Appendix C, Table C1 — Maximum demand for socket outletsSocket outlets in an industrial workshop are used for portable tools, test equipment, and general-purpose loads. Appendix C Table C1 provides:
- First 10 socket outlets: 10 A each = 23.0 kVA at 230 V
- But apply demand factor of 100% for first point, reducing for subsequent points
The practical approach per Appendix C for general-purpose socket outlets:
- First socket outlet: 10 A (2.3 kVA)
- Next 9: 5 A each (1.15 kVA each) = 10.35 kVA
- Remaining 10: 2.5 A each (0.575 kVA each) = 5.75 kVA
Diversified socket outlet load = 18.4 kVA (from 46.0 kVA connected = 40% overall)
Step 4: Air Conditioning
AS/NZS 3000:2018, Appendix C, Table C3 — Maximum demand for air conditioningFor two 10 kW air conditioning units in an industrial space, both are likely to operate simultaneously during hot weather:
- Both units at 100%: 20.0 kW
- No diversity between two units — they serve the same space and operate on the same thermostat cycle
Diversified air conditioning load = 20.0 kW
Step 5: Sum the Diversified Loads
Total Maximum Demand
MD_total = MD_motors + MD_lighting + MD_sockets + MD_aircon MD_total = 67.5 + 8.0 + 18.4 + 20.0 MD_total = 113.9 kW
Converting to current at 415 V, three-phase, assuming overall power factor of 0.85:
Maximum Demand Current
I_MD = MD_total / (sqrt(3) x V x PF) I_MD = 113,900 / (1.732 x 415 x 0.85) I_MD = 113,900 / 611 I_MD = 186 A
Result: 186 A maximum demand vs 280 A if no diversity were applied.
A 200 A main switchboard is adequate. Without diversity, we would have specified a 315 A board — 57% larger and significantly more expensive.
The Comparison Table: Industrial vs Commercial vs Residential
Diversity factors vary substantially between building types because usage patterns differ:
| Load Category | Industrial | Commercial | Residential |
|---|---|---|---|
| Motor loads (group) | 50-80% | 60-80% | N/A |
| Lighting | 90-100% | 70-90% | 60-80% |
| Socket outlets | 30-50% | 20-40% | 30-50% |
| Air conditioning | 80-100% | 70-90% | 50-70% |
| Cooking | N/A | 50-70% | 40-60% (per Appendix C) |
| Water heating | N/A | 30-50% | Controlled load (100%) |
| Overall typical | 65-80% | 50-70% | 40-60% |
Supply Authority Requirements
Individual supply authorities (Ausgrid, Energex, SA Power Networks, etc.) may have their own maximum demand calculation methods that differ from or supplement Appendix C. Always check the relevant supply authority's connection guidelines. Some authorities apply additional after-diversity maximum demand (ADMD) values for residential subdivisions that are more conservative than Appendix C.
Common Mistakes
1. Applying Diversity to Already-Diversified Loads
If the motor load has already been diversified (as in Step 1 above), do NOT apply a further "overall" diversity factor to the motor subtotal. The diversity has already been applied. Applying it twice — first to the motor group, then again to the total — results in an underestimated maximum demand that leads to undersized equipment.
2. Confusing Demand Factor with Diversity Factor
As noted above, the two terms have opposite conventions (demand factor less than 1, diversity factor greater than 1). Misapplying a diversity factor of 1.33 as a multiplier (instead of dividing by 1.33) inflates the maximum demand by 77%. Or, conversely, using a demand factor of 0.75 as a divisor (instead of a multiplier) also inflates it. Be consistent with the convention of the standard you are working to.
3. Using Residential Factors for Commercial Premises
A shopping centre, office building, or hospital has fundamentally different load patterns from a house. Residential diversity factors assume staggered cooking times, off-peak water heating, and intermittent socket use. A commercial kitchen has all ovens on simultaneously during service hours. A hospital has lighting on 24/7 in many areas. Using residential diversity for commercial premises underestimates the maximum demand — sometimes severely.
4. Ignoring Future Load Growth
Appendix C calculates the maximum demand for the loads as they exist today. It does not account for future expansion. Good design practice adds a growth allowance of 15-25% for industrial premises and 10-20% for commercial premises. This is a design decision, not a standard requirement — but neglecting it leads to expensive upgrades within a few years of commissioning.
5. Not Checking Against Measured Data
For existing installations being upgraded or extended, the best diversity data is the actual measured maximum demand from interval metering. A 12-month interval meter record (from the supply authority or a power quality logger) shows the actual peak demand, time of peak, and seasonal variation. This measured data should be used to validate any Appendix C calculation. If the measured data significantly differs from the calculation, investigate why before proceeding.
Bottom Line
Diversity factors are engineering judgement codified into tables. They are not magic numbers — they represent statistical observations about how loads are actually used in practice. Apply them correctly, and you get a right-sized installation. Apply them incorrectly — either too aggressively or too conservatively — and you get either an overloaded installation or an unnecessarily expensive one. Both outcomes are avoidable with a systematic approach and a clear understanding of what the loads actually do.
Try the Maximum Demand Calculator
Free online tool — no signup required

Lead Electrical & Instrumentation Engineer
18+ years of experience in electrical engineering at large-scale mining operations. Specializing in power systems design, cable sizing, and protection coordination across BS 7671, IEC 60364, NEC, and AS/NZS standards.
Related Articles
Maximum Demand Calculation — Diversity Factors Explained Step-by-Step
Calculate maximum demand with diversity factors in 3 steps. Covers AS/NZS 3000, IEC 60364 & NEC Article 220 methods. Free calculator included.
Why Your Earth Electrode Resistance Test Passes — But Your Earthing System Fails
You drove a rod, tested at 5Ω, and moved on. But electrode resistance changes with seasons — a 5Ω reading in the wet season can be 50Ω in the dry. One test doesn't validate your earthing system.
BS 7671 Amendment 4: What's Changing in the Orange Book (2026)
A practising field engineer's guide to BS 7671 Amendment 4. Covers PoE derating, buried duct data, transition timeline, and what it means for your cable sizing calculations.