Skip to main content
IEC 60034 / AS 2789 / NFPA 110

Generator Commissioning Checklist

Free download · A4 (210 × 297mm)

Generator commissioning requires systematic verification of mechanical, electrical, and protection systems. This A4 single-page checklist covers 20 numbered items organized into sections: fuel system integrity (tank level, supply/return lines, leak test), cooling system (coolant level, radiator, thermostat), battery and starting system (electrolyte, charger, crank test), AVR voltage setting and regulation test, frequency verification (50/60Hz ± 0.5%), load bank test sequence (25% → 50% → 75% → 100% → overload), ATS transfer time verification (≤10s typical), protection relay settings (overcurrent, reverse power, earth fault), and earthing continuity. Compliant with IEC 60034, AS 2789, and NFPA 110.

What's Included

Front:20 numbered commissioning items with checkboxes (pass/fail/NA), project info header, and sign-off block with overall result.
Back:Single-sided A4 checklist — no back content.
Size:A4 (210 × 297mm)
Format:PDF, print-ready

How to Print

  • Print on standard A4 paper (80gsm is fine)
  • Black & white printing works perfectly
  • Photocopy and distribute to entire site teams
  • Fill in project details before photocopying
  • File completed checklists for audit trail

Frequently Asked Questions

What paper should I print this on?

Standard A4 paper (80gsm) is fine. Black & white printing works perfectly. Photocopy and distribute to your site team.

Can I distribute this to my team?

Yes. Photocopy and give to every commissioning engineer. File completed copies for your quality audit trail.

What standard does this reference?

Covers requirements from IEC 60034 (rotating machines), AS 2789 (diesel gensets), and NFPA 110 (emergency power systems).

How often is this updated?

Updated when generator commissioning requirements change in the referenced standards. Current version covers the latest editions.