Switchboard Commissioning Checklist
Free download · A4 (210 × 297mm)
Commissioning a switchboard without a checklist is asking for trouble. This A4 single-page checklist covers 22 numbered items across the full commissioning process: mechanical installation verification, electrical connection torque checks, protection device trip testing, circuit labeling, and documentation review. Each item has pass/fail/NA checkboxes with a comments column. The header captures project details and the footer provides a sign-off block for the commissioning engineer with an overall pass/fail result. Designed to meet commissioning requirements from AS/NZS 3000, BS 7671, and IEC 61439. Print one for every switchboard on the project and keep completed forms for your handover documentation package.
What's Included
How to Print
- ●Print on standard A4 paper (80gsm is fine)
- ●Black & white printing works perfectly
- ●Photocopy and distribute to entire site teams
- ●Fill in project details before photocopying
- ●File completed checklists for audit trail
Try the Interactive Calculator
Need precise calculations beyond quick reference? Try our free online calculator with full clause references and professional report output.
Open CalculatorRelated Downloads
Cable Installation
Free printable cable installation inspection checklist. 20-item quality checklist covering routing, termination, testing, and sign-off per AS/NZS 3008, BS 7671, IEC 60364, and NEC.
Earthing System
Free printable earthing system testing checklist. 20-item checklist covering electrode installation, resistance testing, bonding, and fault verification per AS/NZS 3000, BS 7671, IEEE 80, NEC 250.
Arc Flash Talk
Free printable arc flash awareness toolbox talk card. 5-minute safety briefing on arc flash hazards, PPE, safe boundaries, and emergency procedures with attendance record.
Safe Isolation Talk
Free printable cable identification and safe isolation toolbox talk card. 5-minute briefing on LOTO, proving units, permit to work, and the 7-step safe isolation procedure.
Frequently Asked Questions
What paper should I print this on?
Standard A4 paper (80gsm). Black & white printing works fine. Print one per switchboard on the project.
Can I distribute this to my team?
Yes. Hand one to the commissioning engineer for each switchboard. File completed copies for handover documentation.
What standard does this reference?
Covers commissioning requirements from AS/NZS 3000:2018, BS 7671:2018+A2, and IEC 61439 series.
How often is this updated?
Updated when commissioning requirements change in the referenced standards.