Generator Set Commissioning Checklist
Free download · A4 (210 × 297mm)
Commission diesel and gas generator sets with this comprehensive A4 checklist covering 11 sections per IEC 60034 and ISO 8528. Includes pre-start mechanical inspection, fuel and lubricant system check, cooling system verification, battery and starting system test, control panel settings and alarms, first start and no-load run, voltage and frequency regulation, load bank test at 25/50/75/100%, ATS transfer test (normal to emergency to normal), protection relay trip test, and exhaust and vibration assessment.
What's Included
How to Print
- ●Print on standard A4 paper (80gsm is fine)
- ●Black & white printing works perfectly
- ●Photocopy and distribute to entire site teams
- ●Fill in project details before photocopying
- ●File completed checklists for audit trail
Try the Interactive Calculator
Need precise calculations beyond quick reference? Try our free online calculator with full clause references and professional report output.
Open CalculatorRelated Downloads
Motor Starting Record
Free motor starting calculation record template Excel. Document starting current, voltage drop, protection settings per IEC 60034 and NEC Art 430. No signup required.
Max Demand Record
Download a free maximum demand assessment record template Excel per AS/NZS 3000, BS 7671, and NEC Art 220. Columns for load groups, demand factors, diversity, phase assignment, and transformer sizing. No signup required.
Load Schedule
Download a free electrical load schedule template Excel per IEC 60364 and NEC Art 220. Columns for equipment tag, rated power, phases, demand factor, feeder ref, and annual energy. No signup required.
Frequently Asked Questions
What is a generator set commissioning checklist?
A generator set commissioning checklist ensures all mechanical, electrical, and control systems are verified before a standby or prime power generator enters service. It covers pre-start checks through to full load bank testing and ATS transfer per IEC 60034 and ISO 8528.
What should generator commissioning include?
Key checks include fuel and lubricant system, cooling system, battery starting system, first start at no-load, voltage and frequency regulation under load, stepped load bank test (25/50/75/100%), automatic transfer switch operation (normal-emergency-normal), and protection relay trip testing.
Why is a load bank test required for generators?
Load bank testing verifies the generator can deliver its rated power while maintaining voltage and frequency within acceptable limits (typically ±5% voltage, ±0.5 Hz frequency). ISO 8528-6 requires testing at 25%, 50%, 75%, and 100% rated load. It also burns off wet stacking deposits in diesel engines.