Project Description
A commercial building requires a 48 V DC UPS system to provide 30 minutes of backup power for critical IT and communications loads. The battery bank must be sized to deliver the required power for the full backup duration while accounting for aging, temperature effects, and design margins.
This worked example follows the methodology of IEEE 1185:2019 — IEEE Recommended Practice for the Design of DC Auxiliary Power Systems for Generating Stations and general stationary battery sizing principles. The approach applies equally to VRLA (valve-regulated lead-acid) and VLA (vented lead-acid) technologies.
Battery sizing is fundamentally about ensuring sufficient ampere-hour capacity at end-of-life, at worst-case temperature, and at the minimum allowable cell voltage — all three conditions simultaneously.
Given Data
| Parameter | Value |
|---|---|
| System voltage (nominal) | 48 V DC |
| Load power | 12 kW continuous for entire backup period |
| Backup duration | 30 minutes |
| Battery type | VRLA (valve-regulated lead-acid), 12 V monoblocs |
| Cells in series | 24 cells (4 × 12 V monoblocs, each containing 6 cells) |
| End-of-discharge voltage per cell | 1.75 V/cell (minimum per manufacturer) |
| End-of-discharge voltage (system) | 1.75 × 24 = 42.0 V |
| Operating temperature | 25°C (controlled environment) |
| Temperature correction factor (kt) | 1.00 (at 25°C reference) |
| Aging factor (ka) | 1.25 (per IEEE 1185 — battery sized to deliver rated capacity at 80% end-of-life) |
| Design margin (km) | 1.10 (10% additional margin for load growth and uncertainty) |
Step 1: Define the Duty Cycle
The duty cycle describes the load profile over the backup period. In this case, the load is constant:
Duty Cycle Profile:
Period 1: 0 to 30 min — 12 kW continuous
This is a single-period, constant-power duty cycle.
No momentary loads (motor starting, etc.) are present.
Total energy required:
E = P × t = 12 kW × 0.5 h = 6.0 kWh
For more complex duty cycles (e.g., with momentary loads from motor starting or breaker operations), each period would be analysed separately and the most demanding period would govern the cell size. In this case the single continuous load simplifies the analysis.
Step 2: Calculate Discharge Current at End Voltage
The battery must deliver the required power at the minimum system voltage (end-of-discharge voltage), because this is when the current is highest. Using the constant-power discharge model:
At end of discharge, the system voltage is at its minimum:
Vend = 1.75 V/cell × 24 cells = 42.0 V
The discharge current at end voltage (worst case):
Idischarge = P / Vend — (Eq. 1)
Idischarge = 12,000 / 42.0
Idischarge = 285.7 A
At the start of discharge (fully charged battery at approximately 2.15 V/cell × 24 = 51.6 V), the current would be lower:
Istart = P / Vstart = 12,000 / 51.6 = 232.6 A
The current increases throughout the discharge as voltage drops. The cell must be sized to handle the worst-case (end-of-discharge) current for the full duration.
Step 3: Determine Cell Capacity from Manufacturer Discharge Curves
Battery manufacturers provide discharge curves or tables showing the available capacity (Ah) at various discharge rates and end voltages. For a typical VRLA front-terminal battery (e.g., 12 V 100 Ah monobloc at C10 rate), the manufacturer data for discharge to 1.75 V/cell looks like:
| Discharge Rate | Time | Available Capacity (Ah) | Discharge Current (A) |
|---|---|---|---|
| C1 | 1 hour | 70 Ah | 70 A |
| C3 | 3 hours | 85 Ah | 28.3 A |
| C8 | 8 hours | 100 Ah (rated) | 12.5 A |
| C10 | 10 hours | 105 Ah | 10.5 A |
| 30 min | 0.5 hours | 55 Ah | 110 A |
| 15 min | 0.25 hours | 38 Ah | 152 A |
At the 30-minute rate, a single 100 Ah (C8) cell delivers only 55 Ah before reaching 1.75 V/cell. This is the Peukert effect — higher discharge rates yield less available capacity.
Required Ah capacity at 30-minute rate (before correction factors):
Crequired = Idischarge × t — (Eq. 2)
Crequired = 285.7 A × 0.5 h
Crequired = 142.9 Ah (at 30-minute rate to 1.75 V/cell)
Step 4: Apply Correction Factors
Per IEEE 1185, the battery must be sized with correction factors for aging, temperature, and design margin:
Cdesign = Crequired × ka × kt × km — (Eq. 3)
Where:
ka = 1.25 (aging factor — battery capacity drops to 80% at end of life)
kt = 1.00 (temperature correction at 25°C reference)
km = 1.10 (design margin for load growth and uncertainty)
Cdesign = 142.9 × 1.25 × 1.00 × 1.10
Cdesign = 142.9 × 1.375
Cdesign = 196.5 Ah (at 30-minute rate)
Now convert this 30-minute rate requirement back to an equivalent C8 rated capacity (since batteries are specified at C8 or C10 rates):
From the manufacturer data, a cell delivers 55% of its C8 rated capacity
at the 30-minute rate. Therefore:
Crated(C8) = Cdesign(30min) / 0.55 — (Eq. 4)
Crated(C8) = 196.5 / 0.55
Crated(C8) = 357.3 Ah (at C8 rate)
Step 5: Select Battery Configuration
We need 24 cells in series for 48 V nominal. Using 12 V VRLA monoblocs (6 cells per monobloc), we need 4 monoblocs in series. Each monobloc must provide the required C8 capacity.
Configuration options:
Option A: Single string of large-capacity monoblocs
4 × 12 V 370 Ah (C8) monoblocs in series
Total: 48 V, 370 Ah (C8)
Strings: 1
Option B: Two parallel strings of medium-capacity monoblocs
2 strings × 4 × 12 V 200 Ah (C8) monoblocs
Total: 48 V, 400 Ah (C8) combined
Strings: 2
Selected: Option A — 370 Ah (C8) single string
(Fewer cells = lower failure risk, simpler BMS, easier maintenance)
(370 Ah is the next standard size above 357.3 Ah)
Verify the selected battery meets the 30-minute requirement:
Available capacity at 30-min rate:
C30min = 370 × 0.55 = 203.5 Ah
Available capacity at end of life (80%):
CEOL = 203.5 × 0.80 = 162.8 Ah
Required capacity (before aging):
Crequired = 142.9 Ah
162.8 Ah > 142.9 Ah ✓ (14% margin at end of life)
Step 6: Verify Discharge Performance
Final verification — confirm the selected battery can deliver the required power for 30 minutes at end-of-life:
At end of life (80% capacity remaining):
Maximum sustained current at 30-min rate:
Imax = CEOL(30min) / t
Imax = 162.8 / 0.5
Imax = 325.6 A
Required discharge current:
Irequired = 285.7 A
325.6 A > 285.7 A ✓ (14% margin)
Power delivery check at end voltage:
Pavailable = Imax × Vend
Pavailable = 325.6 × 42.0
Pavailable = 13,675 W = 13.7 kW
13.7 kW > 12.0 kW ✓
Actual backup time at rated load (new battery):
tactual = C30min(new) / Idischarge
tactual = 203.5 / 285.7
tactual = 0.712 hours = 42.7 minutes
42.7 min > 30 min ✓ (42% time margin when new)
Result Summary
| Parameter | Value |
|---|---|
| Load power | 12 kW continuous |
| Backup duration required | 30 minutes |
| Discharge current (at 42 V end voltage) | 285.7 A |
| Required capacity (30-min rate, corrected) | 196.5 Ah |
| Required C8 rated capacity | 357.3 Ah |
| Selected battery | 4 × 12 V 370 Ah (C8) VRLA monoblocs |
| System voltage (nominal / end) | 48.0 V / 42.0 V |
| Margin at end-of-life | 14% ✓ PASS |
| Backup time when new | 42.7 minutes ✓ PASS |
A 370 Ah (C8 rate) VRLA battery bank consisting of four 12 V monoblocs in series provides 30 minutes of 12 kW backup with adequate margins for aging, temperature, and design uncertainty. The battery will still deliver the full 30-minute backup at end-of-life (80% capacity) with a 14% margin.
Key References
- IEEE 1185:2019 — IEEE Recommended Practice for the Design of DC Auxiliary Power Systems for Generating Stations
- IEEE 1184:2006 — IEEE Guide for Batteries for Uninterruptible Power Supply Systems (temperature correction tables)
- IEEE 1188:2005 — IEEE Recommended Practice for Maintenance, Testing, and Replacement of VRLA Batteries
- IEEE 485:2020 — IEEE Recommended Practice for Sizing Lead-Acid Batteries for Stationary Applications (duty cycle method)
- IEC 60896-21 — Stationary lead-acid batteries, VRLA types, test methods
- AS 2676.1 — Guide to the installation, maintenance, testing and replacement of secondary batteries in buildings
Try It Yourself
Use the ECalPro Battery/UPS Calculator to size battery banks for your backup power systems. Enter the load power, backup duration, system voltage, and environmental conditions — the calculator determines the required battery capacity with all correction factors, Peukert effect compensation, and end-of-life performance verification.
Try the battery-ups Calculator
Put this methodology into practice. Calculate results with full standard clause references — free, no sign-up required.
Or embed this calculator on your siteFrequently Asked Questions
Related Resources
Battery/UPS Calculator
Size battery banks with automatic correction factors and Peukert effect compensation.
Read moreFukushima Battery System Short Circuit Example
Case study of battery system failure and short circuit analysis during the 2011 disaster.
Read moreEmergency Power Systems Guide
Design guide for emergency and backup power systems including UPS, generators, and batteries.
Read more