Skip to main content

Inspection & Commissioning Checklists

A4 single-page checklists for cable installation, switchboard commissioning, and earthing system testing. Photocopy and distribute to your site team.

20 items available · All free to download

A4 Checklist

Cable Installation

Free printable cable installation inspection checklist. 20-item quality checklist covering routing, termination, testing, and sign-off per AS/NZS 3008, BS 7671, IEC 60364, and NEC.

A4 (210 × 297mm)·Free PDF
A4 Checklist

Switchboard Commissioning

Free printable switchboard commissioning checklist. 22-item checklist covering mechanical, electrical, protection, labeling, and documentation per AS/NZS 3000, BS 7671, IEC 61439.

A4 (210 × 297mm)·Free PDF
A4 Checklist

Earthing System

Free printable earthing system testing checklist. 20-item checklist covering electrode installation, resistance testing, bonding, and fault verification per AS/NZS 3000, BS 7671, IEEE 80, NEC 250.

A4 (210 × 297mm)·Free PDF
IEC 61439-1/2NEW

IEC 61439 Commissioning

Download a free switchboard commissioning checklist aligned to IEC 61439-1/2. Covers visual inspection, insulation resistance, busbar torque, protection settings, earth continuity, and functional testing. No signup required.

A4 (210 × 297mm)·Free PDF
IEC 60364-5-52 / BS 7671NEW

Cable Installation IEC

Download a free cable installation inspection checklist per IEC 60364-5-52 and BS 7671. Covers route verification, bend radius, fire barriers, terminations, labelling, and pre-test. No signup required.

A4 (210 × 297mm)·Free PDF
BS 7671 Part 6 / IEEE 80NEW

Earthing Inspection

Download a free earthing system inspection checklist per BS 7671 Part 6 and IEEE 80. Covers electrode inspection, bonding, resistance measurement, touch and step voltage, and documentation. No signup required.

A4 (210 × 297mm)·Free PDF
NFPA 70E / IEEE 1584NEW

Arc Flash PPE Inspection

Download a free arc flash PPE inspection and maintenance checklist per NFPA 70E and IEEE 1584. Covers arc-rated clothing, face shields, gloves, tools, rating verification, and storage log. No signup required.

A4 (210 × 297mm)·Free PDF
IEC 60034-1 / AS/NZS 1359 / NEMA MG1

Motor Commissioning

Free printable motor installation and commissioning checklist. 22-item quality checklist covering nameplate verification, megger testing, alignment, direction of rotation, overload settings.

A4 (210 × 297mm)·Free PDF
IEC 60034 / AS 2789 / NFPA 110

Generator Commissioning

Free printable generator commissioning checklist. 20-item checklist covering fuel system, cooling, battery/starting, AVR voltage, frequency, load bank test, ATS transfer time, protection relays.

A4 (210 × 297mm)·Free PDF
IEEE 1584-2018 / NFPA 70E / AS/NZS 4836SAFETY

Arc Flash Pre-Work

Free printable arc flash study pre-work checklist. 20-item data collection checklist covering SLD verification, transformer impedance, relay settings, utility fault level, PPE category assignment.

A4 (210 × 297mm)·Free PDF
IEC 61439-1 / AS/NZS 61439 / BS EN 61439

LV Energisation

Free printable LV panel board energisation checklist. 22-item checklist covering insulation test, earth bar continuity, neutral-earth link, incoming cable phasing, busbar torque, CT polarity.

A4 (210 × 297mm)·Free PDF
IEC 62305-3/4NEW

Lightning Protection Inspection

Free lightning protection system inspection checklist PDF. 9 sections covering air termination, down conductors, earth termination per IEC 62305-3/4. No signup required.

A4 (210 × 297mm)·Free PDF
IEC 60076, IEEE C57NEW

Transformer Commissioning

Free transformer commissioning checklist PDF. 11 sections covering winding resistance, TTR, insulation, Buchholz, tap changer per IEC 60076 and IEEE C57. No signup required.

A4 (210 × 297mm)·Free PDF
IEEE 1188, IEC 62040NEW

UPS/Battery Commissioning

Free UPS and battery system commissioning checklist PDF. 11 sections covering cell checks, discharge test, static switch, EPO per IEEE 1188 and IEC 62040. No signup required.

A4 (210 × 297mm)·Free PDF
IEC 60034, ISO 8528NEW

Generator Set Commissioning

Free generator set commissioning checklist PDF. 11 sections covering pre-start, load bank test, ATS transfer per IEC 60034 and ISO 8528. No signup required.

A4 (210 × 297mm)·Free PDF
IEC 61800, NEC Art 430NEW

VFD Commissioning

Free VFD installation and commissioning checklist PDF. 11 sections covering cable routing, parameter setup, harmonic filter per IEC 61800 and NEC Art 430. No signup required.

A4 (210 × 297mm)·Free PDF
NFPA 70E, IEC 60364NEW

Electrical Safety Audit

Free electrical safety audit checklist PDF. 11 sections covering arc flash labels, PPE, LOTO, working space clearances per NFPA 70E and IEC 60364. No signup required.

A4 (210 × 297mm)·Free PDF
IEC 62271, IEEE C37NEW

MV Switchgear Commissioning

Free MV switchgear commissioning checklist PDF. 13 sections covering SF6, primary injection, hi-pot, breaker timing per IEC 62271 and IEEE C37. No signup required.

A4 (210 × 297mm)·Free PDF
IEC 62446, NEC Art 690NEW

Solar PV Commissioning

Free solar PV system commissioning checklist PDF. 12 sections covering string Voc/Isc, inverter setup, anti-islanding per IEC 62446 and NEC Art 690. No signup required.

A4 (210 × 297mm)·Free PDF
BS 5266, IEC 60598NEW

Emergency Lighting Inspection

Free emergency lighting inspection checklist PDF. 11 sections covering function test, battery duration, lux levels per BS 5266 and IEC 60598. No signup required.

A4 (210 × 297mm)·Free PDF